  • :: Geology and Exploration+

    Stage 1 - Desktop Study / Legality Due Diligence / Geological Interpretations
      1. Title search if required / Forestry Status Verification
      2. Reviewing the formation of related coordinates

    Stage 2 - General Survey Stage
      1. Reconnaissance
      2. Outcrop sampling and Sample Analysis (Laboratory to be chosen by client)
      3. Quality estimation
      4. Geological aspects (morphology, formations, stratigraphy, etc)
      5. Land utilization
      6. Distribution of coal
      7. Possible Transportation route survey
      8. Quantity Estimation (Resources : Measured / Indicated / Inferred)
      9. Recommendation for next stage survey

    Stage 3 - Geological Mapping
      1. Geological Mapping
      2. Outcrop sampling and Sample Analysis (Laboratory to be chosen by client)
      3. Quality Estimation and Quality Block Mapping
      4. Trenching / Test Pit
      5. Geological aspects (morphology, formations,stratigraphy, etc)
      6. Distribution of coal
      7. Possible Transportation route survey with information of existing infrastructures available in the surrounding areas
      8. Land Utilization and its ownership
      9. Quantity Estimation (Resources : Measured /Indicated / Inferred)
    10. Recommendation for detailed drilling

    Stage 4 - Detailed Mapping
      1. Detailed Geological mapping
      2. Outcrop sampling and Sample Analysis (Laboratory to be chosen by client)
      3. Detailed Quality Block Mapping
      4. Trenching / Test Pit
      5. Geological aspects(morphology,formations,stratigraphy, etc)
      6. Distribution of coal (seam by seam)
      7. Thorough study of the jetty determined from prev stage.
      8. Estimated compensation cost for the existing land used.
      9. Quantity Estimation (Resources : Measured / Indicated / Inferred)
    10. Recommendation for detailed drilling and JORC Compliance program

    Stage 5 - Intensive Drilling / Reserves Assessment
      a. With JORC Compliance Program
      b. Without JORC Compliance Program
           1.Topographic Mapping
           2. Cropped-Line Intensive Drilling (open hole, coring)
           3. Geophysical Logging
           4. Analysis of Seam by Seam Core Drilling Data
           5. Recommendation for Mineral’s upgrading alternatives * (tentative)
           6. Reserves & Resources / Quantity Evaluation and Estimation (Measured. Indicated, Inferred tonnages)
           7. Calculation of Stripping ratio
           8. Preparation of FINAL Exploration Report and Recommendation for Future work

    Stage 6 - Feasibility Study Stage
      1. Mine Plan (assessment of proven and probable reserves tonnages, seam by seam, stripping ratio)
      2. Hauling Road Plan
      3. Jeetty Construction Feasibility Study
           a. Bathymetric / Hydrographic / Sounding Survey
      4. Environmental Impact Analysis (AMDAL)

  • :: Financial Modelling Services+

    1. Investment Consultancy
    2. Marketing Consultancy
    3. Financing Consultancy
    4. Operational Costs Plan

  • :: Production Control Services+

    1. Quality Control during Production
         Quality control for every 1,000 mts, 2,500 mts and 5,000 mts
         Washability study
         Planning for Processing plant

    2. Cargo Reconnaissance (especially for trading opportunities / Services to international buyers to determine the quality of the cargo by taking representative samples from :
         Channel sampling
         An open pit mine
         Ready stock that has been produced in the stockpile

  • :: Shipment Stage+

    1. Witnessing
         Witnessing party to be on behalf of seller / buyer / anyone to witness the sampling taken by onboard surveyor
    2. Documents handling
         Combining COAs
         Combining Barge BL/Shipper name arrangement


Man Power

Capital Expenditure

Shareholding & Profit Split

Opex – Cost of Operations

Pricing Scheme

Business plan